Topic

Time and work

⏳ Time & Work – Full explanation

Time and work is a work done by one person or several people It is the math part that calculates how long it will take to finish.

📌 Definition

The time taken to complete a job and the amount of work they do Telling the connectionTime & Workis

🧮 Key Formulas

Work = Time × Efficiency

  • ✔ Work
  • ✔ Time
  • ✔ Efficiency

💡 Basic concept

  • ✔ If one completes a piece of work in 10 days → 1 day's work = 1/10
  • ✔ If one completes a work in 5 days → 1 day work = 1/5

📊 Example

  • ✔ A completes a work in 10 days
  • ✔ B completes a work in 20 days

A day's work = 1/10 B one day's work = 1/20

One day's work of A + B = 1/10 + 1/20 = 3/20

Full work = 1 Hence, days = 20/3 ≈ 6.67 days

🔄 Key concepts

  • ✔ More work → More time
  • ✔ More capacity → less time
  • ✔ If many people work together → speed increases

📏 Important notes

  • ✔ Work can always be taken as 1
  • ✔ Time and Efficiency are inverse of each other.
  • ✔ Easy to calculate using LCM method
Important Notes (TNPSC / Maths):
  • ✔ Work = Time × Efficiency
  • ✔ 1 day's work = 1 / days
  • ✔ Work together → Work addition

In the tests “In how many days will A and B together complete the work?”, "How long does it take for someone to quit a job?" Such questions are frequently asked.

⏳ Time & Work – Key formulas

🧮 1. Work base formula

Work = Time × Efficiency

🧮 2. One day work

1 day's work = 1 / days

🧮 3. Working together (A + B)

1 / T = 1 / A + 1 / B

🧮 4. Teamwork (A + B + C)

1 / T = 1 / A + 1 / B + 1 / C

5. Efficiency

Efficiency ∝ 1 / Time

🧮 6. Work rate

Work Ratio = Efficiency Ratio

🧮 7. Man & Days interaction

M₁ × D₁ = M₂ × D₂

📌 Important Notes (TNPSC)

  • ✔ Work can always be taken as 1 unit
  • ✔ Speedy person → completes work quickly
  • ✔ Time and Efficiency inverse
  • ✔ Easy if you use LCM method
  • ✔ Fraction calculation is important
Quick Revision (TNPSC):
  • ✔ 1 day's work = 1 / days
  • ✔ Working together → Addition
  • ✔ M × D = Constant

⏳ Time & Work – 10 Examples + Shortcut Tricks

📘 Example 1

A completes a piece of work in 10 days. B will finish in 20 days. How many days together?

Shortcut:(A × B) / (A + B)

= (10 × 20) / (10 + 20) = 200 / 30 =6⅔ days

📘 Example 2

A – 5 days, B – 10 days

= (5 × 10) / (5 + 10) = 50 / 15 =3⅓ days

📘 Example 3

A – 12 days, B – 18 days

= (12 × 18) / (12 + 18) = 216 / 30 =7.2 days

📘 Example 4

A – 8 days, B – 16 days

= (8 × 16) / (8 + 16) = 128 / 24 =5⅓ days

📘 Example 5

A – 6 days, B – 3 days

= (6 × 3) / (6 + 3) = 18 / 9 =2 days

📘 Example 6

A – 15 days, B – 10 days

= (15 × 10) / (15 + 10) = 150 / 25 =6 days

📘 Example 7

A – 20 days, B – 30 days

= (20 × 30) / (20 + 30) = 600 / 50 =12 days

📘 Example 8

A – 4 days, B – 6 days

= (4 × 6) / (4 + 6) = 24 / 10 =2.4 days

📘 Example 9

A – 9 days, B – 18 days

= (9 × 18) / (9 + 18) = 162 / 27 =6 days

📘 Example 10

A – 7 days, B – 14 days

= (7 × 14) / (7 + 14) = 98 / 21 =4⅔ days

🚀 Key Shortcut Tricks

  • ✔ If there are 2 → (A × B) / (A + B)
  • ✔ One is fast → his day will be short
  • ✔ If Ratio question appears → Use Efficiency
  • ✔ If you take LCM, calculation is easy
  • ✔ If you know how to convert fractions, you can solve them quickly
TNPSC Quick to remember:
  • ✔ Combined Work = (A × B) / (A + B)
  • ✔ Efficiency ∝ 1 / Time
  • ✔ Practice = Speed

🚰 Pipes & Cisterns – Full Description

Pipes & Cisterns refers to pipes that fill or empty a tank A part of mathematics that calculates time using velocity.

📌 Definition

Keep the speed at which a faucet fills or empties the tank Calculating how long it takes for the entire tank to fill or emptyPipes & Cisternsis

🧮 Key Formulas

1️⃣ Filling tube

1 hour of work = 1 / time

2️⃣ Drain pipe

1 hour of work = -1 / time

3️⃣ Work together

1 / T = 1 / A + 1 / B

4️⃣ Fill + Empty

1 / T = 1 / A - 1 / B

💡 Basic concept

  • ✔ Filling tube → Positive (+)
  • ✔ Drain tube → Negative (-)
  • ✔ More speed → less time

📊 Example

  • ✔ A pipe → fills in 10 hours
  • ✔ B tube → empties in 20 hours

A = 1/10 B = -1/20

Add = 1/10 - 1/20 = 1/20

T = 20 hours

🔄 Key concepts

  • ✔ Fill → Plus (+)
  • ✔ Empty → Minus (-)
  • ✔ Easy if you use LCM method

📏 Important notes

  • ✔ Full tank = 1 unit
  • ✔ Take work = Fraction
  • ✔ Multiple pipes → addition / subtraction
Key Notes (TNPSC):
  • ✔ 1 hour work = 1 / time
  • ✔ Fill = + , Empty = -
  • ✔ 1/T = A ± B

Questions include “If one pipe fills while another pipe empties?”, "How long are two pipes together?" Such questions are frequently asked.

People Also Ask

Quick answers for common questions

Correlation of speed and time taken to complete a job.

Work=Rate×Time

1/10 (part done in a day)

A = 1/10, B = 1/20
Total = 1/10 + 1/20 = 3/20
Time = 20/3 ≈ 6.67 days

2 × (1/5) = 2/5 work

Their working rates will be added

1/12 + 1/6 = 3/12 = 1/4
Completed in 4 days

If work speed increases → time decreases

Calculate the work done till then and find the balance work

Questions based on speeds of filling and emptying